Time-dependent transportation network design considering construction impact

  • Utah State University
  • Zhejiang University

Research output: Contribution to journalArticlepeer-review

5 Scopus citations

Abstract

Atraditional discrete network design problem (DNDP) always assumes transportation infrastructure projects to be one-time events and ignores travelers' delays caused by construction work. In fact, infrastructure construction usually lasts for a long time, and the impact on traffic can be substantial. In this paper, we introduce time dimension into the traditional DNDP to explicitly consider the impact of road construction and adopt an overtime policy to add flexibility to construction duration.We address the problem of selecting road-widening projects in an urban network, determining the optimal link capacity, and designing the schedule of the selected projects simultaneously. A time-dependent DNDP (T-DNDP) model is developed with the objective of minimizing total weighted net user cost during the entire planning horizon. An active-set algorithm is applied to solve the model. A simple example network is first utilized to demonstrate the necessity of considering the construction process in T-DNDP and to illustrate the tradeoff between the construction impact and the benefit realized through capacity extension. We also solve the T-DNDP model with data fromthe Sioux Falls network,which contains 24 nodes, 76 links, and 528 origin-destination (O-D) pairs. Computational results for the problem are also presented.

Original languageEnglish
Article number2738930
JournalJournal of Advanced Transportation
Volume2018
DOIs
StatePublished - 2018

Fingerprint

Dive into the research topics of 'Time-dependent transportation network design considering construction impact'. Together they form a unique fingerprint.