Skip to main navigation Skip to search Skip to main content

Subsystem and coupling cost considerations using a visual dependency structure matrix

  • SUNY Buffalo

Research output: Contribution to conferencePaperpeer-review

1 Scopus citations

Abstract

This research demonstrates a methodology that allows designers to incorporate the expense of couplings into their analysis planning activities. While disciplinary analysis tools are increasingly automated, the linkages between functional groups remain largely manual in nature. Results from analyses generally must be manually prepared before used as input to another analysis. This expense of coupling complex system analyses has not previously been addressed in sequencing, scheduling, convergence, or coupling suspension research. The research presented in this paper proposes a new model for evaluating the time and cost of a complex system analysis, whether in the context of a system-level optimization or the evaluation of a single design point. When coupled with visualization-based tools, the proposed model allows designers to evaluate a wider range of analysis scenarios.

Original languageEnglish
StatePublished - 2002
Event40th AIAA Aerospace Sciences Meeting and Exhibit 2002 - Reno, NV, United States
Duration: Jan 14 2002Jan 17 2002

Conference

Conference40th AIAA Aerospace Sciences Meeting and Exhibit 2002
Country/TerritoryUnited States
CityReno, NV
Period01/14/0201/17/02

Fingerprint

Dive into the research topics of 'Subsystem and coupling cost considerations using a visual dependency structure matrix'. Together they form a unique fingerprint.

Cite this