Skip to main navigation Skip to search Skip to main content

Solids Residence Time Impacts Carbon Dynamics and Bioenergy Feedstock Potential in Phototrophic Wastewater Treatment Systems

  • University of Illinois at Urbana-Champaign

Research output: Contribution to journal › Article › peer-review

12 Scopus citations

Abstract

The use of wastewater-grown microalgae has the potential to reduce the cost of algae-derived biofuels while simultaneously advancing nutrient recovery at water resource recovery facilities (WRRFs). However, a significant barrier has been the low yield and high protein content of phototrophic biomass. Here, we examine the use of solids residence time (SRT) as a selective pressure in driving biochemical composition, yield, biofuel production, and WRRF nutrient management cost. We cultivated mixed phototrophic communities in controlled, laboratory-scale photobioreactors on the local WRRF secondary effluent to link SRT with biochemical composition and techno-economic analysis to yield insights into biomass composition and downstream processing effects on minimum fuel selling price. SRT significantly impacted biochemical composition, with total and dynamic carbohydrates the highest at low SRT (total carbohydrates being 0.60 and 0.32 mg-carbohydrate·mg-protein-1at SRT 5 and 15 days, respectively). However, there were distinct differences between extant, steady-state performance and intrinsic potential, and longer SRT communities were able to accumulate significant fractions (51% on an ash-free dry weight basis, AFDW %) of carbohydrate reserves under nutrient starvation. Overall, hydrothermal liquefaction (HTL) was found to be more suitable than lipid extraction for hydrotreating (LEH) and combined algal processing (CAP) for conversion of biomass to fuels, but LEH and CAP became more competitive when intrinsic carbon storage potential was realized. The results suggest that the use of algae for nutrient recovery could reduce the nutrient management cost at WRRFs through revenue from algal biofuels, with HTL resulting in a net revenue.

Original languageEnglish
Pages (from-to)12574-12584
Number of pages11
JournalEnvironmental Science and Technology
Volume55
Issue number18
DOIs
StatePublished - Sep 21 2021

Keywords

  • algal biofuel
  • diel cycle
  • extant and intrinsic growth
  • microalgae
  • nutrient removal
  • selective pressure
  • solids residence time (SRT)
  • techno-economic analysis (TEA).

Fingerprint

Dive into the research topics of 'Solids Residence Time Impacts Carbon Dynamics and Bioenergy Feedstock Potential in Phototrophic Wastewater Treatment Systems'. Together they form a unique fingerprint.

Cite this