Skip to main navigation Skip to search Skip to main content

Reactive scheduling for a single machine: problem definition, analysis, and heuristic solution

  • Yuan Geng Huang
  • , Laveen N. Kanal
  • , Satish K. Tripathi
    • University of Maryland, College Park

    Research output: Contribution to journalArticlepeer-review

    11 Scopus citations

    Abstract

    In this paper we address one of the most commonly occurring dynamic scheduling problems-the machinebreakdown problem. After formally defining the problem we study how optimality of a schedule is continuously affected as breakdown time increases. OUf approach is to solve the problem incrementally, i.e., a schedule is continuously revised during breakdown time to maintain optimal scheduling. Since a fully optimal revision algorithm could be too expensive computationally, we propose a heuristic approach which adjusts the order of jobs dynamically to achieve local optimality. Experiments show that this heuristic strategy results in optimal schedules most of the time at a very low cost.

    Original languageEnglish
    Pages (from-to)6-12
    Number of pages7
    JournalInternational Journal of Computer Integrated Manufacturing
    Volume3
    Issue number1
    DOIs
    StatePublished - 1990

    Fingerprint

    Dive into the research topics of 'Reactive scheduling for a single machine: problem definition, analysis, and heuristic solution'. Together they form a unique fingerprint.

    Cite this