Abstract
Successful on-time delivery of projects is a key enabler in resolving major societal challenges, such as wasted resources and stagnated economic growth. However, projects are notoriously hard to deliver successfully, partly due to their interconnected and temporal complexity which makes them prone to cascading failures. Here, we develop a cascading failure model and test it on a temporal activity network, extracted from a large-scale engineering project. We evaluate the effectiveness of six mitigation strategies, in terms of the impact of task failure cascading throughout the project. In contrast to theoretical arguments, our results indicate that in the majority of cases, the temporal properties of the activities are more relevant than their structural properties in preventing large-scale cascading failures. In practice, these findings could stimulate new pathways for designing and scheduling projects that naturally limit the extent of cascading failures.
| Original language | English |
|---|---|
| Pages (from-to) | 383-400 |
| Number of pages | 18 |
| Journal | Journal of Computational Social Science |
| Volume | 5 |
| Issue number | 1 |
| DOIs | |
| State | Published - May 2022 |
Keywords
- Cascading failures
- Complex networks
- Mitigation strategies
- Project risk
Fingerprint
Dive into the research topics of 'Mitigation strategies against cascading failures within a project activity network'. Together they form a unique fingerprint.Cite this
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver