Abstract
Two efficient cyclic scheduling heuristics for re-entrant job shop environments were developed. Each heuristic generated an efficient and feasible cyclic production schedule for a job shop in which a single product was produced repetitively on a set of machines was to determine an efficient and feasible cyclic schedule which simultaneously minimized flow time and cycle time. The first heuristic considered a repetitive production re-entrant job shop with a predetermined sequence of operations on a single product with known processing times, set-up and material handling times. The second heuristic was a specialization of the first heuristic where the set-up for an operation could commence even while the preceding operation was in progress. These heuristics have been extensively tested and computational results are provided. Also, extensive analysis of worst-case and trade-offs between cycle time and flow time are provided. The results indicate that the proposed heuristics are robust and yield efficient and superior cyclic schedules with modest computational effort.
| Original language | English |
|---|---|
| Pages (from-to) | 2635-2657 |
| Number of pages | 23 |
| Journal | International Journal of Production Research |
| Volume | 39 |
| Issue number | 12 |
| DOIs | |
| State | Published - Aug 15 2001 |
Fingerprint
Dive into the research topics of 'Cyclic scheduling heuristics for a re-entrant job shop manufacturing environment'. Together they form a unique fingerprint.Cite this
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver