Skip to main navigation Skip to search Skip to main content

BrIM for project delivery and the life-cycle: State of the art

  • Arun M. Shirole
  • , Timothy J. Riordan
  • , Stuart S. Chen
  • , Qiang Gao
  • , Hanjin Hu
  • , Jay A. Puckett
  • Arora and Associates
  • SUNY Buffalo
  • University of Wyoming

Research output: Contribution to journalArticlepeer-review

18 Scopus citations

Abstract

Bridge Information Modelling (BrIM) was introduced to bridge enterprise stakeholders in design, construction, operations and management. These stakeholders are increasingly realizing that a well thought out leveraging of bridge data for multiple purposes through the entire bridge life cycle is important. This paper surveys the genesis and development of BrIM supported by NSBA, NCHRP, AASHTO, and FHWA. This includes aspects that distinguish it from its close cousin, Building Information Modeling (BIM). Principal questions, issues, and challenges that have been raised by various stakeholders about BrIM are summarized in this paper to help clarify the way forward to increased industry acceptance and deployment of BrIM-enabled workflow.

Original languageEnglish
Pages (from-to)173-187
Number of pages15
JournalBridge Structures
Volume5
Issue number4
DOIs
StatePublished - 2009

Keywords

  • BrIM
  • data
  • IPD
  • life-cycle
  • workflow
  • XML

Fingerprint

Dive into the research topics of 'BrIM for project delivery and the life-cycle: State of the art'. Together they form a unique fingerprint.

Cite this