TY - GEN
T1 - Approximating Unrelated Machine Weighted Completion Time Using Iterative Rounding and Computer Assisted Proofs
AU - Li, Shi
N1 - Publisher Copyright:
Copyright © 2025 by SIAM.
PY - 2025
Y1 - 2025
N2 - We revisit the unrelated machine scheduling problem with the weighted completion time objective. It is known that independent rounding achieves a 1.5 approximation for the problem, and many prior algorithms improve upon this ratio by leveraging strong negative correlation schemes. On each machine i, these schemes introduce strong negative correlation between events that some pairs of jobs are assigned to i, while maintaining non-positive correlation for all pairs. Our algorithm deviates from this methodology by relaxing the pairwise non-positive correlation requirement. On each machine i, we identify many groups of jobs. For a job j and a group B not containing j, we only enforce non-positive correlation between j and the group as a whole, allowing j to be positively-correlated with individual jobs in B. This relaxation suffices to maintain the 1.5-approximation, while enabling us to obtain a much stronger negative correlation within groups using an iterative rounding procedure: at most one job from each group is scheduled on i. We prove that the algorithm achieves a (1.36 + ϵ)-approximation, improving upon the previous best approximation ratio of 1.4 due to Harris. While the improvement may not be substantial, the significance of our contribution lies in the relaxed non-positive correlation condition and the iterative rounding framework. Due to the simplicity of our algorithm, we are able to derive a closed form for the weighted completion time our algorithm achieves with a clean analysis. Unfortunately, we could not provide a good analytical analysis for the quantity; instead, we rely on a computer assisted proof. Nevertheless, the checking algorithm for the analysis is easy to implement, essentially involving evaluation of maximum values of single-variable quadratic functions over given intervals. Therefore, unlike previous results which use intricate analysis to optimize the final approximation ratio, we delegate this task to computer programs.
AB - We revisit the unrelated machine scheduling problem with the weighted completion time objective. It is known that independent rounding achieves a 1.5 approximation for the problem, and many prior algorithms improve upon this ratio by leveraging strong negative correlation schemes. On each machine i, these schemes introduce strong negative correlation between events that some pairs of jobs are assigned to i, while maintaining non-positive correlation for all pairs. Our algorithm deviates from this methodology by relaxing the pairwise non-positive correlation requirement. On each machine i, we identify many groups of jobs. For a job j and a group B not containing j, we only enforce non-positive correlation between j and the group as a whole, allowing j to be positively-correlated with individual jobs in B. This relaxation suffices to maintain the 1.5-approximation, while enabling us to obtain a much stronger negative correlation within groups using an iterative rounding procedure: at most one job from each group is scheduled on i. We prove that the algorithm achieves a (1.36 + ϵ)-approximation, improving upon the previous best approximation ratio of 1.4 due to Harris. While the improvement may not be substantial, the significance of our contribution lies in the relaxed non-positive correlation condition and the iterative rounding framework. Due to the simplicity of our algorithm, we are able to derive a closed form for the weighted completion time our algorithm achieves with a clean analysis. Unfortunately, we could not provide a good analytical analysis for the quantity; instead, we rely on a computer assisted proof. Nevertheless, the checking algorithm for the analysis is easy to implement, essentially involving evaluation of maximum values of single-variable quadratic functions over given intervals. Therefore, unlike previous results which use intricate analysis to optimize the final approximation ratio, we delegate this task to computer programs.
UR - https://www.scopus.com/pages/publications/85216393955
M3 - Conference contribution
AN - SCOPUS:85216393955
T3 - Proceedings of the Annual ACM-SIAM Symposium on Discrete Algorithms
SP - 553
EP - 571
BT - Annual ACM-SIAM Symposium on Discrete Algorithms, SODA 2025
PB - Association for Computing Machinery
T2 - 36th Annual ACM-SIAM Symposium on Discrete Algorithms, SODA 2025
Y2 - 12 January 2025 through 15 January 2025
ER -