Abstract
In several successful accelerated bridge construction projects in Florida and Texas, pre-fabricated bridge pier components have been utilized, which result in significant reduction of the construction schedule. This paper summarizes major accelerated bridge construction projects through adopting pre-fabricated bridge pier components, which shows its popularity in recent years. In particular, details in geometry, reinforcement, and connections from several projects are compared, focusing on their applicability in seismic regions. Systems in seismic regions investigated recently by several research groups are also summarized and compared. As concluding remarks, issues and recommendations regarding connections and reinforcement detailing are summarized.
| Original language | English |
|---|---|
| Pages | 79 |
| Number of pages | 1 |
| DOIs | |
| State | Published - 2006 |
| Event | Structures Congress 2006 - St. Louis, MO, United States Duration: May 18 2006 → May 21 2006 |
Conference
| Conference | Structures Congress 2006 |
|---|---|
| Country/Territory | United States |
| City | St. Louis, MO |
| Period | 05/18/06 → 05/21/06 |
Fingerprint
Dive into the research topics of 'Accelerated bridge pier construction in the U.S. Seismic implications'. Together they form a unique fingerprint.Cite this
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver