TY - GEN
T1 - A plan for assessing the damage to highway bridges after an earthquake
AU - O’Connor, J. S.
AU - Alampalli, S.
N1 - Publisher Copyright:
© 2024 The Author(s).
PY - 2024
Y1 - 2024
N2 - A post-earthquake response plan and bridge inspection guidelines were developed under a research project funded by the New York State Department of Transportation. The Earthquake Response Plan consists of four levels of response, delineated by ranges of earthquake magnitude. A phased approach was used, first mobilizing maintenance workers familiar with the road network to provide a quick initial assessment. This was followed by detailed bridge inspections performed by certified bridge inspectors and, if necessary, by engineers with specialized skills. Key advantage of the proposed response plan is that it was developed to mesh well with the sponsoring agency’s existing staffing and organizational structure. The project report contains a process flowchart, clear lines of responsibility, prioritization methods, reporting forms, list of necessary resources, sample photos of possible earthquake damages, strategies for post-earthquake repairs, and staff training exercises. This paper briefly describes the earthquake response plan.
AB - A post-earthquake response plan and bridge inspection guidelines were developed under a research project funded by the New York State Department of Transportation. The Earthquake Response Plan consists of four levels of response, delineated by ranges of earthquake magnitude. A phased approach was used, first mobilizing maintenance workers familiar with the road network to provide a quick initial assessment. This was followed by detailed bridge inspections performed by certified bridge inspectors and, if necessary, by engineers with specialized skills. Key advantage of the proposed response plan is that it was developed to mesh well with the sponsoring agency’s existing staffing and organizational structure. The project report contains a process flowchart, clear lines of responsibility, prioritization methods, reporting forms, list of necessary resources, sample photos of possible earthquake damages, strategies for post-earthquake repairs, and staff training exercises. This paper briefly describes the earthquake response plan.
UR - https://www.scopus.com/pages/publications/85200414231
U2 - 10.1201/9781003483755-394
DO - 10.1201/9781003483755-394
M3 - Conference contribution
AN - SCOPUS:85200414231
SN - 9781032770406
T3 - Bridge Maintenance, Safety, Management, Digitalization and Sustainability - Proceedings of the 12th International Conference on Bridge Maintenance, Safety and Management, IABMAS 2024
SP - 3329
EP - 3336
BT - Bridge Maintenance, Safety, Management, Digitalization and Sustainability - Proceedings of the 12th International Conference on Bridge Maintenance, Safety and Management, IABMAS 2024
A2 - Jensen, Jens Sandager
A2 - Frangopol, Dan M.
A2 - Schmidt, Jacob Wittrup
PB - CRC Press/Balkema
T2 - 12th International Conference on Bridge Maintenance, Safety and Management, IABMAS 2024
Y2 - 24 June 2024 through 28 June 2024
ER -