Skip to main navigation Skip to search Skip to main content

Workshop: "Best Practices for Seismic Design and Retrofit of Bridges" Preparation of Presentation Material

Project: Research

Project Details

StatusFinished
Effective start/end date06/1/0812/31/08

Funding

  • Federal Highway Administration: $5,000.00